| Share | close |
Share this site with your friends
Twitter |
Google bookmarks |
Facebook |
Yahoo bookmarks |
Myspace |
Delicious |
Friendfeed |
Digg |
Installation
![]() |
Vertical collector: a hole is drilled for the installation of a geothermal probe |
![]() |
Termeo Cap' Te 12 Cap' Heating capacity: 12 kW, three-phase Option: domestic hot water Multi-level house with a surface area of 163 m² built in 2008 in the Puy-de-Dôme département (central France) Equipment integrated into the home's utility area: no noise, no marks |
FIND OUT MORE
| Certifications and quality | |

